|
 |
case study: retrofit- kraft, texas
Kraft produces many different products in their Garland, Texas facility. Each product they produce requires its own unique operation and therefore operational environment. When at all possible, SES will try to limit the different types of fixtures used on a project to just one. However some projects like Kraft require multiple types of fixtures to achieve the desired results. This is a prime example of SES applying our operational experience to a customer’s situation in order to exceed our customers’ expectations.
| case study: retrofit- kraft, texas |
| Type of Operation |
Manufacturing |
| Square Footage |
225,000 |
| Hours of Operation |
7 Days/Wk, 24 Hrs/Day |
| Cost / Kilowatt |
$0.075 |
| Competing Fixture |
400W Metal Halide |
| Installed Fixture |
4 Lamp T5 HO |
| Quantity of Fixtures |
606 |
| Mounting Height |
22’ |
| Retrofit Project Cost |
$179,000 |
| Annual Energy Savings |
$89,000 |
| Energy Rebate |
No Rebate Available |
| Project Payback |
2.01 Years |
|
|
|